
Pakistan Day Parade — 23 March
Government of Pakistan
Engineering and installation works delivered for the national Pakistan Day Parade held on 23 March — executed to strict timelines under full security protocol.
A selection of engineering and construction projects delivered to government-grade standards. Detailed case studies and project photography are added on an ongoing basis.

Government of Pakistan
Engineering and installation works delivered for the national Pakistan Day Parade held on 23 March — executed to strict timelines under full security protocol.

President's House (Aiwan-e-Sadr)
Continuous, year-round operation and maintenance of solar systems, power generation, lifts, fire alarm networks and HVAC across the President's House — keeping critical building services running without interruption.

President's House (Aiwan-e-Sadr)
Design and installation of a fire sprinkler system at the President's House, engineered to meet life-safety standards for a high-security national facility.

President's House (Aiwan-e-Sadr)
Comprehensive waterproofing of the President's House, protecting the structure against water ingress and extending the life of the building fabric.

President's House (Aiwan-e-Sadr)
In-house manufacturing and on-site installation of a boiler system at the President's House, delivered as a complete mechanical package from fabrication to commissioning.

President's House (Aiwan-e-Sadr)
Manufacturing of purpose-built cold storage facilities for the President's House, engineered for reliable temperature control and continuous duty.

President's House (Aiwan-e-Sadr)
Supply and installation of a complete heating system for the dairy farms at the President's House, maintaining stable conditions throughout the winter months.

President's House (Aiwan-e-Sadr)
Full renovation and refurbishment of officer rooms at the President's House, combining civil finishing works with upgraded building services.

President's House (Aiwan-e-Sadr)
White wash and surface treatment of the President's House elevation, restoring the facade of one of the nation's most recognisable buildings.

Cabinet Division
Renovation of public washrooms at the Cabinet Division to a modern specification — new finishes, fittings and upgraded plumbing throughout.

Cabinet Division
Repair and installation of cooling tower components at the Cabinet Division, restoring full cooling capacity and improving operating efficiency.

Circuit House
Supply and installation of an automated blind control system at the Circuit House, adding motorised operation and centralised control.

Private Clients
Complete design and construction of bespoke designer houses in Islamabad — from architectural concept through to structural works and premium finishing.
… and many more
The projects above are a selection of our work. For a complete portfolio, project references and documentation, please get in touch.
From civil works to complete electro-mechanical solutions, our team is ready to deliver to the highest government and commercial standards.